Power Plants

Power Plants – Combined Cycle

SEC Power Plant PP-13 – Piping Works. Dhurma – Riyadh – KSA

Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC

Details: Fabrication, Welding and Installation of High Energy Piping Works including NDE, PWHT and Hydro-testing.

Commencement: October, 2016

Completion: March, 2018

 

SEC Power Plant PP-13 Two Air Cooled Condensers (ACC’s) Erection Works. Dhurma – Riyadh – KSA

Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC
Details: Erection of two Air Cooled Condenser (42 Fans) (Units 18 and 28) including all Electro-Mechanical, Equipment and Steel Structure works related to the PP13 – Power Plant.
Commencement: December, 2015
Completion: March, 2018

 

SEC Power Plant Hail-2 Erection Of ACC and 4 Nos. HRSGs.  HAIL – KSA

Employer: Al Toukhi Company For Industry, Trading And Contracting

Details: Erection Works Including ASME Stamp A & PP of Four Heat Recovery Steam Generators (HRSGs) Supplied By Amec Foster Wheeler and One Air Cooled Condenser (ACC), at “Conversion Of HAIL-2 Simple Cycle to Combined Cycle Power Plant” Project.

Commencement: July, 2015

Completion: December, 2017

 

Samra Phase lll Combined Cycle Project. Samra – JORDAN

Employer: METKA – SEPGCO

Details: All Electrical Systems including 400KV step up transformers, Control Centers, Cabling and Raceways.

Commencement: January, 2014

Completion: December, 2014

 

Qatrana Combined Cycle 370MW Electro-Mechanical Works. Qatrana – JORDAN

Employer: LOTTE Engineering & Construction, KOREA

Details: Mechanical erection for combined cycle power plant (370 MW) consisting of two gas turbine, two boilers and one steam turbine and all related balance of plant equipment. Design and detail engineering, construction and commissioning of fire protection and detection systems and HVAC.

Commencement: January, 2010

Completion: August, 2011

 

SAMRA Phase II Combined Cycle 100MW – Civil, Architectural and Electro -Mechanical Works. Samra – JORDAN

Employer: SEPCO III/ CHINA – SEPGCO

Details: All Civil Works related to SAMRA II Combined Cycle including Earthworks, Boiler Foundations, Steam Turbine Building and Roads. Architectural and Finishing works including plastering, tiling, painting, ceiling works, doors and windows. Electro-Mechanical works Consist of Fire Fighting and fire Alarm System Mechanical Piping, Painting, Insulation, Plumbing, HVAC and Electrical Erection Works.

Commencement: December, 2008

Completion: May, 2010

 

Samra Phase l Combined Cycle 300MW – Electrical, Mechanical and Earth Works. Amman – JORDAN

Employer: Black & Veach – GAMA J.V. – SEPGCO

Details: Electro-Mechanical installation of a complete combined cycle power plant of 300MW capacity comprising two GE frame 9E gas turbines. Two heat recovery steam generators, steam turbine and generator, air cooled condenser, water treatment plant, all electrical systems including 400KV step up transformers, control centers, DCS system, cabling and raceways and Complete Earth Works consisting of 400,000m3 of Backfilling and 100,000m3 of Excavation.

Commencement: September, 2004

Completion: September, 2006

 

Conversion of Aqaba Thermal Power Station to Dual Firing (Natural Gas and Heavy Fuel Oil) 500MW. Aqaba – JORDAN

Employer: Central Electricity Generating Company (CEGCO)

Details: Consortium with Alstom Power Boilers – France, who designed, manufactured the main equipment. MAG designed, supplied and erected all civil works, electrical works, controls and piping. Also erection of equipment supplied by Alstom.

Commencement: January, 2002

Completion: July, 2004

Power Plants – Simple Cycle

IPP3 Gas Infrastructure System Project  Al-Ghabawi – JORDAN

Employer: AAEPC – Wartsila

Details: All Civil, Electrical, Piping and Equipment Installation Works related to IPP3 Gas Infrastructure System Project.

Commencement: June, 2015

Completion: October, 2015

 

Al Manakher IPP4 Power Plant – Civil and Electro-Mechanical Works. Amman – JORDAN

Employer: Wartsila

Details: Stuctural Steel for Buildings, Including Power Houses, Administration and Workshop Buildings, Stacks, Ventilation Fans, HVAC and Electro-Mechanical Services. Complete Electro-Mechanical Erection Work for 280MW (16 Gensets x 17.5MW) Tri-Fuel Power Plant, including all Equipment Piping, Insulation, Painting, Electrical and Control Erection and Testing Works for the biggest Tri-Fuel Plant in the World.

Commencement: May, 2013

Completion: March, 2014

 

SEC Power Plant PP-13 – Piping Works. Dhurma – Riyadh – KSA

Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC

Details: Fabrication, Welding and Installation of High Energy Piping Works including NDE, PWHT and Hydro-testing.

Commencement: October, 2016

Completion: May, 2017

 

Samra Power Station Fast Track Simple Cycle Combustion Turbine. Al Zarqa – JORDAN

Employer: METKA

Details: Electro-Mechanical work for 146MW power plant consist of one Gas Turbine Alstom GT13E2, auxiliaries, balance of plant and piping. The project will be carried out on a fast track basis.

Commencement: December, 2012

Completion: May, 2013

 

Qatrana Cement Factory Power Plant 50MW. Qatrana – JORDAN

Employer: WARTSILLA

Details: Complete Electro-Mechanical Erection Works including supply and Fabrication of Tanks for 7x7MW Diesel Power Plant for Cement Factory at Qatrana.

Commencement: January, 2009

Completion: November, 2009

 

Samra Phase II Power Station 200MW – Two Frame 9E turbine – Civil and Electro-Mechanical Works. Samra – JORDAN

Employer: GE Int’l / SEPGCO

Details: All Civil Works related to two Gas Turbine Frame 9E including earth works consisting of 400,000m3 cut, roads, buildings and foundations. Complete Electro-Mechanical Works and two diverters and bypass stacks.

Commencement: July, 2006

Completion: March, 2008

 

132/400KV Substations at Qatrana and Amman North. JORDAN

Employer: NEPCO ISOLUX/SPAIN

Details: Erection Works for the 132KV & 400KV Substations at Amman North and Qatrana including 132KV GIS switchgear at Amman North.

Commencement: January, 2004

Completion: February, 2005

 

Risha-5 Gas Turbine 40MW – One Frame 6 Gas Turbine Civil and Electro-Mechanical Works. Risha – JORDAN

Employer: GE – CEGCO

Details: Complete Civil Works and Foundations including Earth Works and Roads all Electro-Mechanical Works including External Pipe Works.

Commencement: July, 2004

Completion: February, 2005

 

Rehab – 13 Power Station 100MW – One Frame 9E Gas Turbine Civil and Electro-Mechanical Works. Rehab – JORDAN

Employer: GE International Inc. – CEGCO

Details: Complete Civil Works including, Buildings, Road works and Foundations for F9E Gas Turbine Generator and 15,000m³ capacities Fuel Oil Tank, all Mechanical works including erection of One Gas Turbine Frame 9E and all external pipe works.

Commencement: October, 2001

Completion: January, 2003

 

Rehab-12 Power Station 100MW – One Frame 9E Civil Works. Rehab – JORDAN

Employer: Marubeni – CEGCO

Details: Complete civil and building works for one gas turbine (frame 9E) at Rehab Power station and two fuel oil storage tanks each 3000m³ capacity with all their accessories.

Commencement: November, 1995

Completion: August, 1996

 

United Iron and Steel Diesel Power Plant 23MW. Zizya – JORDAN

Employer: United Iron and Steel Manufacturing Co.

Details: Dismantling, Relocating, Refurbishing and Civil Works of Two Diesel Power Stations totaling 23 MW from Al-Hasa Site to Zizya Site.

Commencement: March, 1995

Completion: September, 1995

 

Amman South 30MW One Frame 6 Gas Turbine – Civil and Electro-Mechanical Works. Amman – JORDAN

Employer: Marubeni – CEGCO

Details: Complete Civil, Electro-Mechanical Works for 1 No. 30MW gas turbine.

Commencement: November, 1994

Completion: September, 1995

 

Risha – 4 and Rehab 10, 11 – Three Frame 6 Gas Turbine 90 MW Civil and Electro-Mechanical Works. Risha and Rehab – JORDAN

Employer: TechNip – JEA

Details: Complete Civil and Building Works for 3 No. Gas Turbines in Risha and Rehab, 30MW each.

Commencement: February, 1994

Completion: January, 1995

 

33/11 KV Distribution Substations. Abu Dhabi

Employer: Water and Electricity Dept. – Government of Abu Dhabi

Details: The construction of 15 Nos. 33/11 KV substations in different locations.

Commencement: December, 1982

Completion: December, 1984

 

Al Hussein Power Station 30MW. Zarqa – JORDAN

Employer: Jordan Electricity Authority

Details: All Civil and Electro-Mechanical Works Related to the Installation of a 30MW Gas Turbine.

Commencement: October, 1974

Completion: August, 1975