Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC
Details: Fabrication, Welding and Installation of High Energy Piping Works including NDE, PWHT and Hydro-testing.
Commencement: October, 2016
Completion: March, 2018
Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC
Details: Erection of two Air Cooled Condenser (42 Fans) (Units 18 and 28) including all Electro-Mechanical, Equipment and Steel Structure works related to the PP13 – Power Plant.
Commencement: December, 2015
Completion: March, 2018
Employer: Al Toukhi Company For Industry, Trading And Contracting
Details: Erection Works Including ASME Stamp A & PP of Four Heat Recovery Steam Generators (HRSGs) Supplied By Amec Foster Wheeler and One Air Cooled Condenser (ACC), at “Conversion Of HAIL-2 Simple Cycle to Combined Cycle Power Plant” Project.
Commencement: July, 2015
Completion: December, 2017
Employer: METKA – SEPGCO
Details: All Electrical Systems including 400KV step up transformers, Control Centers, Cabling and Raceways.
Commencement: January, 2014
Completion: December, 2014
Employer: LOTTE Engineering & Construction, KOREA
Details: Mechanical erection for combined cycle power plant (370 MW) consisting of two gas turbine, two boilers and one steam turbine and all related balance of plant equipment. Design and detail engineering, construction and commissioning of fire protection and detection systems and HVAC.
Commencement: January, 2010
Completion: August, 2011
Employer: SEPCO III/ CHINA – SEPGCO
Details: All Civil Works related to SAMRA II Combined Cycle including Earthworks, Boiler Foundations, Steam Turbine Building and Roads. Architectural and Finishing works including plastering, tiling, painting, ceiling works, doors and windows. Electro-Mechanical works Consist of Fire Fighting and fire Alarm System Mechanical Piping, Painting, Insulation, Plumbing, HVAC and Electrical Erection Works.
Commencement: December, 2008
Completion: May, 2010
Employer: Black & Veach – GAMA J.V. – SEPGCO
Details: Electro-Mechanical installation of a complete combined cycle power plant of 300MW capacity comprising two GE frame 9E gas turbines. Two heat recovery steam generators, steam turbine and generator, air cooled condenser, water treatment plant, all electrical systems including 400KV step up transformers, control centers, DCS system, cabling and raceways and Complete Earth Works consisting of 400,000m3 of Backfilling and 100,000m3 of Excavation.
Commencement: September, 2004
Completion: September, 2006
Employer: Central Electricity Generating Company (CEGCO)
Details: Consortium with Alstom Power Boilers – France, who designed, manufactured the main equipment. MAG designed, supplied and erected all civil works, electrical works, controls and piping. Also erection of equipment supplied by Alstom.
Commencement: January, 2002
Completion: July, 2004
Employer: AAEPC – Wartsila
Details: All Civil, Electrical, Piping and Equipment Installation Works related to IPP3 Gas Infrastructure System Project.
Commencement: June, 2015
Completion: October, 2015
Employer: Wartsila
Details: Stuctural Steel for Buildings, Including Power Houses, Administration and Workshop Buildings, Stacks, Ventilation Fans, HVAC and Electro-Mechanical Services. Complete Electro-Mechanical Erection Work for 280MW (16 Gensets x 17.5MW) Tri-Fuel Power Plant, including all Equipment Piping, Insulation, Painting, Electrical and Control Erection and Testing Works for the biggest Tri-Fuel Plant in the World.
Commencement: May, 2013
Completion: March, 2014
Employer: Gama Power Systems Arabia LTD. / Saudi Electricity Co. SEC
Details: Fabrication, Welding and Installation of High Energy Piping Works including NDE, PWHT and Hydro-testing.
Commencement: October, 2016
Completion: May, 2017
Employer: METKA
Details: Electro-Mechanical work for 146MW power plant consist of one Gas Turbine Alstom GT13E2, auxiliaries, balance of plant and piping. The project will be carried out on a fast track basis.
Commencement: December, 2012
Completion: May, 2013
Employer: WARTSILLA
Details: Complete Electro-Mechanical Erection Works including supply and Fabrication of Tanks for 7x7MW Diesel Power Plant for Cement Factory at Qatrana.
Commencement: January, 2009
Completion: November, 2009
Employer: GE Int’l / SEPGCO
Details: All Civil Works related to two Gas Turbine Frame 9E including earth works consisting of 400,000m3 cut, roads, buildings and foundations. Complete Electro-Mechanical Works and two diverters and bypass stacks.
Commencement: July, 2006
Completion: March, 2008
Employer: NEPCO ISOLUX/SPAIN
Details: Erection Works for the 132KV & 400KV Substations at Amman North and Qatrana including 132KV GIS switchgear at Amman North.
Commencement: January, 2004
Completion: February, 2005
Employer: GE – CEGCO
Details: Complete Civil Works and Foundations including Earth Works and Roads all Electro-Mechanical Works including External Pipe Works.
Commencement: July, 2004
Completion: February, 2005
Employer: GE International Inc. – CEGCO
Details: Complete Civil Works including, Buildings, Road works and Foundations for F9E Gas Turbine Generator and 15,000m³ capacities Fuel Oil Tank, all Mechanical works including erection of One Gas Turbine Frame 9E and all external pipe works.
Commencement: October, 2001
Completion: January, 2003
Employer: Marubeni – CEGCO
Details: Complete civil and building works for one gas turbine (frame 9E) at Rehab Power station and two fuel oil storage tanks each 3000m³ capacity with all their accessories.
Commencement: November, 1995
Completion: August, 1996
Employer: United Iron and Steel Manufacturing Co.
Details: Dismantling, Relocating, Refurbishing and Civil Works of Two Diesel Power Stations totaling 23 MW from Al-Hasa Site to Zizya Site.
Commencement: March, 1995
Completion: September, 1995
Employer: Marubeni – CEGCO
Details: Complete Civil, Electro-Mechanical Works for 1 No. 30MW gas turbine.
Commencement: November, 1994
Completion: September, 1995
Employer: TechNip – JEA
Details: Complete Civil and Building Works for 3 No. Gas Turbines in Risha and Rehab, 30MW each.
Commencement: February, 1994
Completion: January, 1995
Employer: Water and Electricity Dept. – Government of Abu Dhabi
Details: The construction of 15 Nos. 33/11 KV substations in different locations.
Commencement: December, 1982
Completion: December, 1984
Employer: Jordan Electricity Authority
Details: All Civil and Electro-Mechanical Works Related to the Installation of a 30MW Gas Turbine.
Commencement: October, 1974
Completion: August, 1975